Spaghetti Junction: Engineering Support Over Live Traffic

Durban
20 Nov 2026
Share on

An interchange that outgrew its design

When the N2/N3 interchange in KwaZulu-Natal opened in the late 1960s, it was built for a very different volume of traffic. Known locally as Spaghetti Junction, it now sits where two of South Africa's most important transport corridors meet, carrying commuters, freight and much of the traffic moving to and from the Port of Durban.

The interchange and its surrounding roads have long exceeded their original capacity. The result is congestion that costs commuters time and freight operators money.

Its upgrade forms part of a major national infrastructure programme. The goals are clear: better traffic flow along the N2 and N3, shorter delays, smoother freight movement through the Durban port gateway, and wider economic growth for the region, including work for local people and opportunities for SMMEs.

Uni-span's role

Uni-span was subcontracted to supply formwork and support solutions for four of the project's key structures: two bridges and two three-lane portals.

Each structure brought its own demands. Together, they called for a combination of shoring, scaffolding and formwork systems that could handle heavy loads, fit tight working spaces and keep a complex programme moving.

Heavy loads, tight clearance, live traffic below

The project's defining technical challenge was a difficult combination: significant structural loads within restricted clearance, often with traffic still running beneath the works.

Shutting the road was not an option on one of the country's busiest interchanges. The support system had to carry the load, fit the space and protect the traffic below.

Uni-span's answer was its Super Uni-Max Beams. Designed specifically for bridge construction over live traffic, they handled the demanding loads within the limited working envelope, allowing construction to continue overhead while the interchange stayed open.

Keeping four structures on programme

With multiple structures under construction on a major infrastructure project, every day on site counts. Efficient installation and assembly were essential to holding the programme.

Uni-MF Frames helped on both fronts. Because they could be pre-assembled, less work had to happen on site. They also reduced the need for special components and bespoke solutions, simplifying supply and speeding up installation.

The full system on site

Alongside the beams and frames, Uni-span supplied:

  • Uni-MF Heavy-Duty Shoring Towers, providing support for bridge construction under demanding structural loads
  • Kwikstage Scaffolding, meeting the project's scaffolding and access requirements

Building a better-connected network

Spaghetti Junction shows what complex infrastructure demands from its support partners: systems matched to the real conditions on site, not just the drawings.

By supplying purpose-designed formwork and support for two bridges and two portals, Uni-span helped keep a nationally significant upgrade moving, contributing to a transport network that will serve KwaZulu-Natal and South Africa for decades to come.